(firstly, MacJones didnt tell us they were going out there but as we would have told them it still had a tree to be removed)
- There was a gum tree that had to be removed (I contacted the developers and had words with them over this as we were promised a clear block. They paid $2000 for removal which was good)
- Cement truck and bob cat parked on block (Neighbours were having their driveway removed and they decided our block was a good place to use)
- Blocks of cement from driveway dumped on block
- 1-2 Tonnes of road base dumped on our block
- Sewer pipe and water main run over and broken from people on our block.
(Concreters paid to fix the sewer pipe but refused to pay for the water one)
-Rubbish, bricks and cement on block from builders next door (metricon) When we called metricon we were basically told to get lost
Super frustrating as now MacJones wont send someone out for another 2 weeks.. back to the waiting game